Drainage of storm water by means of trench gutters. Relocation and modification of the storm sewer system with installation of 22 Tegra plastic manholes and 22 plastic street inlets. The construction of the measures at the sewer outlets prevented water from flowing into the sewer network at elevated levels of the Hron through the existing outlets. As part of the measures, a new valve manhole with sluice gates was constructed, into which the existing sewer pipes were connected, and a new SKL pipe route was also constructed. Bystrička stream outlet - delivery and installation of a street inlet with a gate valve and a PTK flap.