Implementation of external distribution of utility networks for the extension of the Bonfiglioli production plant in Považská Bystrica. The construction was carried out on a brown meadow and consisted of a 100 m long sewage sewer, a 310 m long storm sewer and a 390 m long fire water pipeline. Furthermore, the foundation for the fire tank and the machine room was implemented.

en_GB