In the Donghee plant in Strecno, an extension of the warehouse and production halls was carried out, where external storm and sewage sewerage pipes, a drinking water connection and an NTL gas connection with a control cabinet were supplied. An ORL was installed on the oiled portion of the storm sewer. A total of 18 inspection manholes were also supplied.

en_GB