The project deals with the construction of new networks for the drainage of oily and clean rainwater to the soakaway boxes and sewage water from the site. The construction included the installation of a pumping station with technology, ORL, grease traps and a water meter shaft. The fire water supply system was made of HDPE pipe D225=180 m, water connection from TVL pipe DN80=9 m and from HDPE pipe DN80=44 m. The horizontal water supply in the hall consisted of grease and sewage drainage - PP master pipe DN150/DN125/DN100=446 m and condensate drainage - PVC pipe DN100=455 m. The horizontal water supply was made of HDPE pipe D32=25 m.