Implementation of storm water drainage on the newly constructed container area at the KIA plant. The sewerage system was supplied from Ultra Rib 2 pipe (full rib). These pipes were additionally polyfusion welded to achieve a perfect leak tightness. A total of 14 manholes were supplied on the sewer.

en_GB