The reconstruction of the handling line and paved areas at the handling and forwarding warehouse for timber in Oravský Podzámek was carried out. The works consisted mainly of the rehabilitation of paved areas, storm water drainage and the handling line, which was in a state of disrepair. The delivery also included a fire water connection.

en_GB