Implementation of storm sewerage system, which serves as retention + connection of roof drains, gutters and street drains. The storm sewer also included a detention basin, ORL, a pumping station with technology and discharge piping to the outlet structure, and a pumping station for the drainage outlet. Sewage sewerage with connections where a pumping station with technology and discharge pipe was also constructed. Fire water supply and installation of overhead hydrants, water connections for ATS and hall with water meter shaft were also implemented. External and internal lay-down sewage and water pipelines. The installation of a solenoid valve with a valve shaft was also carried out within the horizontal pipelines. Realization of premises gas.