Implementation of the second stage of flood protection measures on the Ráztoky stream in the Nolčovo municipality, which consisted of strengthening the banks with stone blocks and backfilling with rubble stone. The stream bed was further deepened and widened. The total length of the section to be treated was 150 m.

en_GB