Within the construction object SO 01 - Water reservoir building, iron-concrete works for the construction of reinforced concrete structures of water reservoir tanks and water reservoir manipulation chamber were carried out. Within the next construction object SO 03 - Paved areas and landscaping, reinforced concrete works were also carried out for the construction of monolithic reinforced concrete retaining walls in the area of the water reservoir building.

en_GB