The purpose was to provide water from a 139 m3 fire tank to extinguish a fire for the Rail Tunnel Diel. It is a dry pipe line made of TVL pipes with a length of 2224.8 m. The object also included the supply of technology to the pumping station and electrical wiring, valve shafts, tunnel hydrants, air ducts and water connection.

en_GB